Completed works


Tank bus online, Almagro

The construction of the tank was made in our industrial plant. Once completed, It was moved to its final location.

The tank was built in carbon steel plate, Double stitching of MIG welding (Internal and external)

Tank capacity: 60

Tank in dealership's cars, Agronomy

The construction of the tank was in the manufacturing plant. Once completed, It was moved to its final location.

The tank was built in carbon steel plate, double seam welding MIG system (Internal and external)

Tank capacity: 12


Tank API 650 in Industrial Park, Pilar

The construction of the tank was in the manufacturing plant. Once completed, It was moved to its final location.

The tank was built under the rules API 650, carbon steel sheet, double seam welding MIG system (Internal and external)

Tank capacity: 80

 

 


Tank in Artear (Channel 13), Constitution

The construction of the tank was in the manufacturing plant. Once completed, It was moved to its final location.

The tank was built in carbon steel plate, double seam welding MIG system (Internal and external).

Tank capacity: 80

 


Tank in supermarket Coto, Belgrano

Construction of the tank in the basement of the new supermarket. The time total for the construction was of 17 days.

The tank was built in carbon steel plate, double seam welding MIG system (Internal and external).

Tank capacity: 240


Tank in supermarket Coto, Barracas

The first part of this work, It was the dismantling of a former tank, to leave the space free. So then we built our tank in the second basement, the new supermarket Coto. The total time between dismantling and Assembly of the new tank was of 25 days.

The tank was built in carbon steel plate, and double seam welding MIG system (internal and external).

Tank capacity: 220


Tank at Accenture, The silver

The tank was built in a basement, the final destination of the tank. The total time for the Assembly thereof was of 5 days.

The tank was built in carbon steel plate, and double seam welding MIG system (internal and external)

Tank capacity: 60

 


 

API tank 650 in plant Yamaha, Moreno

The tank was built under the rules API 650, in three parts in the manufacturing facility and then taken to the place of destination, Once there the three parts were welded to finish the tank and place it in the final position.

The tank was built in carbon steel plate, and double seam welding MIG system (internal and external).

Tank capacity: 420


 

Tanks in distribution center Coto, Esteban Echeverría

Both tanks were built in the place of final location, the total time for the Assembly thereof was of 30 days.

They were built in carbon steel plate, and double seam welding MIG system (internal and external).

Capacity of tanks: 700 each.


 

Tank in tank transport of loads, Barracas

Both tanks were built in the manufacturing facility, and then transferred to the final destination.

They were built in carbon steel plate, and double seam welding MIG system (internal and external).

Tank capacity: 60 each